32.9.3.2 Confirming Execution Results - NRD/NRDP
Program Example
NRD
Stores the current date in the date variable.
-
When the positive transition instruction turns ON,
the NRD instruction will execute. When the NRD instruction is
executed, the current date is stored in the date variable in
D1.
NRDP
-
When the normally open instruction turns ON, the
NRDP instruction will be executed. When the NRDP instruction is
executed, the current date is stored in the date variable in
D1.
|